Building Work in October/November 2021

Scheduled building work at the school is continuing.

During the October Holidays, the following will take place:

  • New pin boards will be installed in the refurbished P7 area.
  • The upper gateway from Flass Road into the playground will be widened and new gates will be fitted. This is the first step of a project to make it possible for vehicles to enter by that route. This will be needed when the modular unit is being built and will also allow emergency vehicles and routine maintenance vehicles into the top playground. Rest assured that the vehicle gates will be locked to stop unauthorised access and keep children safe. Pedestrian access will not be compromised but we will have more secure gates to keep shut during playtimes.
  • A site inspection will be carried out in preparation for the work to build the new modular unit (extension to the school in light of a growing roll). No contractor has yet tendered for the job of building the modular unit (hence the delay) but Fife Council are carrying this work out now to reduce the timescale of the build once a contractor has been identified.

During November, the Nursery Garden will be extended. This will likely take 4 days. It can’t be done over the October Holidays as the fencingĀ  materials aren’t available yet. As long as the materials are ready in time, it will be done over the weekend of the November in-service day to minimise disruption.