We got messy making papier-mache helmets.
We have now painted them and are looking forward to using the glue gun to add more detail.
We look forward to showing you the end result!
Watch this space!!!
We got messy making papier-mache helmets.
We have now painted them and are looking forward to using the glue gun to add more detail.
We look forward to showing you the end result!
Watch this space!!!
P5c were asked to design a mode of transport that might be used in the future. Their ideas were out of this world and below are some of their designs!
The Scenario – Build a Bridge
P5c were asked if they could design and build a bridge that would allow all vehicles to cross the river but also allow boats, which may be taller than the bridge, to pass under. The challenge they were set is outlined below and the results and photos of the winning designs can also be found in our blog.
The Challenge
You have ONE HOUR.
Your task is to design and build a bridge which can span across 2 desks and have a way of opening to allow boats to pass under. The bridge needs to be able to support the weight of a small bottle of water without collapsing and open to allow any size of boat through.
The Specifications
Your bridge must:
 Be at least 19cm high (the height of a grey K’Nex rod)
ï‚· Be at least 30cm long (the length of a standard ruler)
ï‚· Have a strong robust structure to stand on its own
ï‚· Be able to support the weight of a small bottle of water or equivalent weight
ï‚· Be able to open to allow tall river vessels to pass through safely.
1st place – Callum To and Jake
2nd place – Lewis and Zia
3rd place – Laura and Gina