Amazing aerial photographs show the new build against a background of much of the EHS catchment area. The roof on the PE block is finished and the roofing materials for the main block were being unloaded this afternoon with the return of the huge crane. Meanwhile the concrete for the PE floor has been laid and is starting to be poured for the main block. Very good progress! Very much enjoyed my brief visit to the site on Friday – good to be able to get onto the first floor and get a real sense of the layout. Thank you! An excellent way to mark my retirement.