Thursday 28th July

IMG_3738 IMG_3746 IMG_3736 IMG_3745 IMG_3743 IMG_3735

Three weeks is a long time on a construction site!  Since the start of the holidays there have been big changes – particularly with the steel framework for the PE department now in place.  Concrete was being poured for the foundations of the main block with signs that there will soon be changes to be seen there with the building of the lift shafts.  Good to see several members of the local community looking at the site with high levels of interest.

Leave a Reply

Your email address will not be published. Required fields are marked *