Monday 30th May 2016

IMG_3330 IMG_3331 IMG_3332 IMG_3335 IMG_3338 IMG_3337

This week there are views of various parts of the construction site.  The accommodation units continue to be developed with the tarred road providing quality access to the building area.  The markers on the site of the main building are an indication that piling will be starting soon.  Meanwhile there is continued work preparing the area for the PE block.

Last week we had a fire drill, with a simulated scenario.  Pupils and staff had to use the evacuation route around the building.  This was a useful exercise to increase awareness during the period when the school operates in the present building with a construction site immediately alongside.  All went very well and everyone showed a good level of recognition of risks and of what to do.