Latest photographs include a selection taken by a drone flying over the site last week. However, even since then the buildings have changed. The roof is now on the PE block. Everyone was fascinated to watch the giant crane lift the sections along the length of the building. Meanwhile the frame for the main building continues to grow and cannot be far from completion. The school website – www.elginhigh.moray.sch.uk – has a link to a time lapse film of the first months of construction.