Monday 12th September 2016

IMG_4102 IMG_4098 IMG_4103 160901-DJI_0022-web 160901-DJI_0012-web 160901-DJI_0037-web IMG_4094 IMG_4099 160901-DJI_0029-web

Latest photographs include a selection taken by a drone flying over the site last week.  However, even since then the buildings have changed.  The roof is now on the PE block.  Everyone was fascinated to watch the giant crane lift the sections along the length of the building.  Meanwhile the frame for the main building continues to grow and cannot be far from completion.  The school website – www.elginhigh.moray.sch.uk – has a link to a time lapse film of the first months of construction.

Week Beginning 5th September 2016

IMG_4087 IMG_4086 IMG_3920 IMG_4083 IMG_4078 IMG_4081 IMG_4080 IMG_3925 IMG_4077

Last week’s visitors from Zambia thoroughly enjoyed their stay in Elgin.  The had the opportunity to inspect the construction site and were very impressed.  This week the work continues to advance quickly.  The frame of the main building is almost complete.  The arrival of the massive crane will see the roof sections for the PE block moved into place.  Meanwhile there have been useful meetings finalising details of some interior areas.