We worked with our friends in Primary 6/7 and Primary 7 to prepare for building a tyre mural in the upper playground.
Some of us recycled soil from the school grounds by digging it up with shovels and forks.
Once the soil was dug up, we transferred it into bags and wheelbarrows and the transporters worked hard to take it from the soil patch to the grassy area in the upper playground.
In the upper playground, Β the team of artists designed and painted our recycled tyres. They look amazing!!
What a great afternoon, proving that teamwork really does make the dream work!!Β
Watch this space for the end product of all our hard work!!Β
All that hard work made me tired even im in bed try to relax
U guys tried
The diving was very tiring but still fun and you had to use your strength πππͺ
Building those big strong muscles!!