Primary two have been exploring measure. Pupils were given a design challenge to build a 3D model of the new Cross Arthurlie nursery using a construction material of their choice. They had to follow a design brief, the model was to be longer than 30cm but less than 1m and it had to be taller than 20cm.
Pupils had lots of fun working with one another. Throughout this activity they were developing their skills in cooperation, problem solving and measuring.