Over the last two weeks we’ve watched the builders prepare the foundations for the concrete pour that will create the solid base for the new school building to sit on.
Author Archives: PaulBlakey
Drainage works
We can now see lots of pipes where water will move around our building for sinks and toilets.
Progress Update
The area where the pitch was has been covered with lots of stone and soil to raise it to the same level as the rest of the playground.
Preparing ground
Back in August our MUGA pitch disappeared! All the fencing and the pitch itself were cleared to make way for the new building. Then the builders started to raise the level of that part of our playground so that they could build on a flat surface.

