Roll and Accomodation

In session 2016-2017 we expect the school roll to be around 775 and it is forecast that the roll will continue to rise in the future.

Since the Academy opened there have been major upgrades to all areas of the school.  Home Economics, Science, Music and P.E. departments and a new performance/social area/canteen extension opened during session 2008/2009.   An extension to the Technical and Art Departments was completed in November 2011 and the most major extension opened in 2015 with new social areas, a new gym hall,  maths, music and ASfL classrooms. Fourteen well equipped temporary classrooms are also currently in place.

The Art and Design, Home Economics and Technical teaching areas and the Support for Learning Department are on the ground floor.

Drama occupies a well equipped purpose-built drama studio.  Music is very well equipped and consists of two large classrooms and four music practice rooms for instrumental instruction.  Drama and Music also utilise the facilities in the performance area.

Computing and Business Education access four networked rooms of PCs . Three further networked rooms are available on the ground floor and in the library area. Most other rooms have at least one additional PC. The Art department has a network of Apple Macs. The Academy is  WiFi enabled and has a bank of laptops and  portable devices that enhance facilities.

The spacious library is well stocked with traditional printed resources and Internet facilities. The library is very well served by professional librarians who are always available to give assistance. The network of 20 computers is available for pupils and staff use when not being used as a teaching resource. Pupils are encouraged to use the library at all times including lunchtimes.

The Canteen, with two serving areas, is open in the morning before school starts for a breakfast service and during morning interval and at lunchtimes. It is always very popular with pupils and staff alike.  A Cashless Catering system operates in the canteen and this has proved very successful.

Physical Education occupies two games halls and  gym for indoor activities and theory lessons. The new  flood-lit, 3G astro turf pitch will be ready for use during October 2016. There are also very large playing fields adjacent to the school of which the department makes full use throughout the year.  A superb dance / fitness area with gym facilities also exists.

The school office and reception is situated at the main entrance. There is a separate Community Learning and Development office in the main  building.

Parents are invited to view the facilities and accommodation of the school at various times.

 

Implemented using Glow Blogs

Report a Glow concern  Cookie policy  Privacy policy

Glow Blogs uses cookies to enhance your experience on our service. By using this service or closing this message you consent to our use of those cookies. Please read our Cookie Policy.

Close